What North Las Vegas Homeowners Say About Fielding ADU Builders North Las Vegas
Reviews matter here because an ADU is a five-figure decision made before you’ve seen a single wall framed. We earn the words below the same way we earn the work: a written price before anything starts, permits pulled by the book, background-checked crews on site, and a one-year guarantee we actually honor. These are North Las Vegas homeowners talking about what that felt like.
Recent Reviews

We wanted a detached ADU in the backyard for my mother-in-law, and the lot in Aliante is tight against the block wall. Fielding walked the setback rules with us, got the variance sorted, and handed us a written number before anyone touched a shovel. The final invoice matched it to the dollar. Six months in, no cracks, no callbacks, nothing but a finished unit.
Andres V. – Aliante, North Las Vegas
Our garage was a junk room for eight years. Fielding turned it into a studio for my son while he finishes school at CSN, and they handled the permit and inspection side so I didn’t have to chase the city. The crew was uniformed and background-checked, which mattered to me with kids in the house. They left the driveway cleaner than they found it.
Luis T. – Centennial Hills, North Las Vegas
I researched Abodu and Boxabl for months before calling anyone, and Fielding was the only crew that didn’t try to talk me out of prefab or oversell me on a conventional build. They matched the platform to our budget and our lot, then put the price in writing. The summer heat here is brutal on exterior finishes, and they were upfront about which materials hold up. Straight answers the whole way.
Paige T. – Summerlin North, North Las Vegas
We added a two-room addition off the back of the house for my parents, and living through construction with three kids was the part I dreaded. Fielding stuck to the schedule they gave us and kept the site tidy every single evening. When one exterior trim piece started looking off after the first monsoon, they came back under the one-year guarantee and fixed it at no charge. That’s the whole reason we picked them.
Carrie V. – North Las Vegas, near Craig Ranch
Our lot backs up to open desert off Lone Mountain, and the wind and dust out here wreck cheap construction. Fielding used James Hardie siding and built the ADU to handle it. What sold us was the written price before work started, no change-order games, no surprise line items at the end. My rental unit was occupied within weeks of final inspection.
Andres V. – Lone Mountain, North Las Vegas
We converted the garage into a casita for my sister, and Fielding was the third contractor we talked to. The first two gave us verbal ballparks and got vague when we asked about permits. Fielding put everything on paper, pulled the permits, and passed inspection without us lifting a finger. If you’re in North Las Vegas and tired of guessing what a garage conversion actually costs, call them.
Paige T. – North Las Vegas, near Cheyenne and Decatur
Why Customers Trust Us
The reviews above keep landing on the same few things, and that’s no accident. It’s The Garrison Code: show up in the window, price in writing, do it by the book, leave it clean, and stand behind it for a year. Our background-checked, uniformed crews work under The Garrison Standard, and the 365-Day Done Right Promise is spelled out on paper: if a workmanship defect shows up inside that year, we come back and make it right at no charge. Fielding works with Abodu, Cover, Dvele, Mighty Buildings, Boxabl, and Plant Prefab, plus conventional builds with James Hardie siding, so the build method fits your lot and budget instead of the other way around. The price you approve on day one is the price on the final invoice. Call (844) 797-5166 for a free estimate.
Written by the team at Fielding ADU Builders North Las Vegas.


